Before
The basement before the project began. This photo also shows the location of the exposed ledge.
Concrete Floor Removal
This is is the beginning of the concrete floor removal process.
SmartJack Installation and Concrete Shelf
Post SmartJack installation and beginning to prepare for concrete pouring and creating the concrete shelf to cover the exposed ledge.
Concrete Floor Removal and SmartJacks
More floor removal and more SmartJack installed to support the above floor.
New Concrete Slab Ready
All of the old concrete has been removed, stone has been spread and the basement is now ready for the new concrete slab.
Concrete Floor Finished
The new concrete slab has been installed.
TripleSafe Pump and SaniDry
The TripleSafe Sump Pump and SaniDry systems are installed to remove any water or moisture from the space.
Concrete Shelf
The concrete shelf is complete and ledge is now concealed.